Not executed.
Not executed.
The external power supply of the building is allowed from the built neighboring one - at 30 m.
The transformer substation, which is a joint investment with the neighboring building and has been operational since October 2008.
Internal Installation - not constructed.
A drainage system has been constructed around the entire building with 3 manholes.
The outgoing sewage system from the building to the central sewer is not constructed.
The external water supply (drinking water). A pipe network Ø 120 has been laid for laying the water supply.
From the connection point to the property with inspection manholes.
The internal plumbing installation has not been installed.
Not executed
It's not completed
An asphalt road with protective curbs has been completed from the main road to the adjacent two buildings.
About 30 meters of the route and a turning point in front of the building are left to be completed.